Al Qassimi Hospital Modular Operation Theaters
Maternity Department
Pediatrics Department
Infants Department
Gynecology Department
Extension of the services of Al-Qassimmy Hospital, for additional 200 beds for Maternity, Gynecology and Pediatrics as self-contained Hospital for all kinds of services/facilities.
It was also decided to extend the Emergency department of the existing hospital to respond to the additional needs for better emergency services.
The building was constructed over an area of 43,500 square meters, developed according to a rational management of space, which translates into a clear separation between the various departments: the three main units (gynecology, obstetrics, and pediatrics), area of medical treatment, the patient area, the ward reserved for VIP (6 suites and 3 royal suites), called the Royal Ward, with private entrance.
The pavilion of the new Emergency Room is located between the old and the new hospital, and serves as link to the two buildings.
Mechanical Works
The mechanical works included a reverse osmosis water process and distribution system, sanitary fixtures, laminar air flow systems including HVAC system. High Efficency Partical Arrestance Filtration System. Anti microbial walls, flooring and false sealing. Ot Table Installation and gases system installation.
Electrical Works
The electrical works included the supply, installation, testing and commissioning of the power distribution system, all control panels, standby diesel generator, earthing and lightning protection system, all low-voltage and alarm systems, fire detection and alarm system and public address system.